Quote:
Originally Posted by svynx
Because of work issues/not having a lot of time, the box isn't finished yet. All but one side is welded, and I still need to cut, drill, tap the 1/4" piece for the connections. Once that is all done, I'd be more than happy to take some pics (this is after all my thread, and I haven't given much input in a while). The tank will hold about 3/4 of a gallon. I figured since the heat exchanger is on the large side, and the top mount is too, I didn't need much of a reservoir.
|
I'm in the same position. I'm out of town at least 2 weeks per month because of work, sometimes more. It seems like projects take forever because of that!
Regards,
GS